Owning special equipment for logistics, like 600-ton and 800-ton cranes and special sliding trailer for transporting turbine blades, Nasb Niroo Co. has succeeded in construction operations, transportation, and installation of 22 units of 2.5 mw wind turbine in Kahak wind farm located in Qazvin Province. Also, today, relying on educated human resources, special machinery, and institutionalized knowledge, Nasb Niroo Co. is implementing the engineering, procurement, and construction (EPC) of the Aghkand wind farm (including 20 units if 2.5 mw wind turbines).
No. 45 , West 27 , Kurdistan highway , Tehran
14155/6514
All rights reserved